Kwik-Klik designed and installed a bespoke Fire Rated sealed partition wall in a huge biomass power plant in Sittingbourne, Kent.
The Ridham power station required a permanent dust screen to be fitted above four large conveyor belts that carry waste into the plant.
100mm Fire Rated PIR panels were cut to size and angled between the floor and ceiling to create a chamber above the conveyors. Special flashings were made to establish airtight seals around all of the joints and a built-in door allows plant personnel access to the conveyors.
“An angled rather than a vertical partition was the most effective way to achieve a sealed environment” said Kwik-Klik Director, Jason Rayner. “We also designed a new flashing solution to achieve the required airtight joints.”
System used
K-K Fire Rated
Bespoke heavy duty sealed partition