Kwik-Klik installed a 6m high Fire Rated hoarding in Meadowhall Shopping Centre to allow the store upgrade and fit-out of the new Vanilla fashion store.

55 linear metres of the Kwik-Klik’s One Hour Fire Rated hoarding system was installed over 3 nights and the re-usable hoarding stayed in place for 14 weeks before is was dismantled by our experienced Retail team.

Secure digi-lock Double Personnel Doors were built into the hoarding to allow access for the trades and shopfitting teams.

Branded Graphics were created and installed by our in-house graphics team and we worked closely with the Vanilla team throughout the project.

Systems used

K-K Fire Rated
Heavy duty hoarding system

Graphics
Professional branded graphics created and installed by our in-house team