Hoarding systems designed and installed by Kwik-Klik contributed to the safe operation of Birmingham New Street during all phases of its £600m redevelopment.
Over 2000 linear metres (1.2 miles) of Kwik-Klik hoardings created dozens of secure work areas, walkways, screens, fire exits, temporary barriers, tunnels, entrances and gateways.
The station remained open throughout the project. Systems used included Clip to Scaffold R-11 (Network Rail grey and white), Fire Rated, Floor to Ceiling and Kwik-Klik Freestanding.
The hoardings were dismantled and re-located on-site as work phases were completed and different trade and construction teams moved in and out.
Many installations took place overnight, with up to 22 Kwik-Klik personnel working simultaneously on several hoardings around the BNS site.
Systems used
K-K Clip to Scaffold R-11
K-K Floor to Ceiling
K-K Fire Rated