Kwik-Klik installed a 70 linear metre 3-storey link tunnel at Northampton General Hospital NHS Trust using its versatile Clip to Scaffold system which was attached to an extensive and intricate scaffold frame.
The Kwik-Klik team took part in a week’s planning and worked closely with the Main Contractor and a Scaffold Specialist before specifying and installing the robust PVC Clip to Scaffold system.
The second photograph shows the scaffold frame on the right and the third photograph shows the PVC in place.
Grey PVC was specified by the NHS and a single leaf and double leaf digi-lock personnel door was installed at each end of the tunnel.