Kwik-Klik installed 200 linear metres of Clip to Scaffold hoarding at Reading Station.
Network Rail are building 9 new platforms and and a covered passenger footbridge concourse with lift and escalator access. Our hoardings created a central compound for the main principal contractors.
Hoardings are also sited along other platforms allowing the station to operate as normal. The project uses 500mm wide x 3 metre high Clip to Scaffold panels which are manufactured in the UK to Network Rail’s R-11 specifications in their corporate colours.
The panels used are made from 100% recycled PVC and at the end of their life, these panels are also 100% recyclable.
System used
K-K Clip to Scaffold
K-K R-11 Hoarding