We installed an extensive Kwik-Klik hoarding at Asda’s Robroyston store in Glasgow.
Over 100 linear metres of grey 100% recycled PVC panels were installed in one night for the first phase of the project. 450 square metres of fire barrier film was used to seal off the work area to roof height above the hoarding.
A scissor lift was used to safely install the 5 metre high Kwik-Klik hoarding.
As soon as part of the hoardings were complete, staff began re-locating fridges and shelving and re-stocking them before the store opened in the morning.
System used
Kwik-Klik Freestanding
Versatile and robust indoor system