Kwik-Klik installed over 800 square metres of Fire Rated hoarding to screen a food court re-development at Bluewater in Kent.
The panels reduced the noise heard by shoppers and created safe pedestrian corridors with wayfinding graphics attached. The hoarding also created a secure central worksite for the principal contractor.
200 square metres of Kwik-Klik 100% recycled hoarding panel were also installed during the Wintergarden project. These panels lower the carbon footprint of every project and eliminate waste sent to landfill sites.
Systems used
K-K Fire Rated
Heavy duty noise-suppressing panel
Kwik-Klik
Durable, lightweight PVC system