Since 2006 Kwik-Klik has been involved in numerous landmark projects at worksites throughout the UK and Ireland. We work closely with Principal Contractors and direct clients to deliver professional, secure and sustainable hoarding and partition systems for indoor and external refurbishment and construction programmes.
We have provided tailor-made systems for major airports, railway and underground stations, the NHS, prestigious construction projects, blue chip manufacturers, premier shopping centres and the UK’s leading retailers, including the biggest supermarket and department store brands.
Our projects span all sectors (and regions) including Heathrow, Network Rail, Coca Cola, M&S, Sky, Canary Wharf, Asda, Sainsbury’s, the Trafford Centre, Bullring, Bluewater, St David’s, The Shard and the RAF air base at Lossiemouth in Scotland.
The Kwik-Klik team excels in formulating innovative solutions to all kinds of worksite challenges including temporary Pedestrian Tunnels. Take a look at our Projects by sector by clicking on the green boxes below, or view the full range of our completed installations by moving down the page.
M&S, Pudsey External
Kwik-Klik installed a 115 linear metre branded Kentledge hoarding for M&S in Pudsey, Leeds to enable work to begin on a new and expanded M&S Foodhall.
HMS Victory, Portsmouth
Kwik-Klik installed 75 linear metres of 1.2m high Freestanding PVC partitions to guide visitors around deck repair work being carried out on board HMS Victory in Portmouth.
Manchester Art Gallery
Kwik-Klik planned and installed an 8 linear metre run of indoor Clip to Scaffold SR3 hoarding to screen the replacement of an entrance door at Manchester Art Gallery.
Riverside Stand, Fulham
Kwik-Klik installed a 55 linear metre Fire Rated temporary pedestrian tunnel on the ground floor of Fulham FC's new Riverside Stand.
Sephora Launch, Trafford Centre
Kwik-Klik's graphics team produced a huge range of graphics to flood The Trafford Centre in Manchester with Sephora branding for its launch in the shopping centre.
Glasswater Locks, Birmingham
Kwik-Klik designed and installed a bespoke 100 linear metre run of In-Ground hoarding on the canal towpath boundary of Glasswater Locks in Birmingham.
25th Anniversary, Trafford Centre
Kwik-Klik is delighted to be involved in installing graphics to celebrate the 25th Anniversary of the opening of Manchester's iconic Trafford Centre
Davis Cup Tennis, Manchester
Kwik-Klik planned and installed 200 linear metres of branded low-rise tennis court partitions for two practice courts at the September 2023 Davis Cup Group Stage Qualifiers
Trafford Centre 2023
Kwik-Klik has worked closely with the Trafford Centre team to install bespoke temporary graphics which promote the shopping centre during renovation projects.
Southampton General Hospital
Kwik-Klik installed 104 linear metres of 1 hour Fire Rated hoarding to create a hygienic temporary tunnel to link two buildings at Southampton General Hospital.
M&S, Trafford Centre
Kwik-Klik installed bespoke Fire Rated and Freestanding hoardings with branded M&S hoarding graphics at Manchester's Trafford Centre
The Piece Hall, Halifax
Kwik-Klik installed three separate hoardings at The Piece Hall, Halifax, to help transform the historic open air cloth hall into a secure concert venue for a series of world famous bands.